Project Highlights
Modernized FF&E package was installed in each guest suite with an emphasis on natural oaks, neutral textures, and beige undertones.
New premium-grade tile was installed throughout the entirety of each suite including bedrooms, bathrooms, and common areas.
An integrated Lutron system was installed, and all overhead and decorative lighting was replaced.
New trim package included valances, baseboards, accent wall battens, and tambour paneling in kitchen areas.

Overview
Project Scope
The 355 reimagined guest suites were designed with a bright, warm, and modern feel to complement the South Beach aesthetic. The project was completed in 30 weeks and covered 200,000 square feet of space.
